6 HOLES INTERSECT NEAR SOLID SULPHIDES; ASSAY RESULTS FOR TWO AT REED LAKE, MANITOBA DISCOVERY ZONE

 

29 January, 2008

Vancouver, B.C. January 29, 2008. VMS Ventures Inc. (TSX.V: VMS) (the "Company") is pleased to report assay results and an update on the progress of its ongoing drill program at the Reed Project Discovery Zone near Snow Lake, Manitoba.

Highlights:

Hole RD 07 07:        26.27m (86.19 feet) of 1.0% Cu & 4.48% Zn

      - Including 2.03 m of 4.06% Cu & 3.8 m of 10.75% Zn                      

Hole RD 07 10:        43.08m (141.34 feet) of 0.72% Cu & 4.27% Zn

       -Including 10.26m of 8.26% Zn

Hole RD 07 12:        32.73m (107.38 feet) of Near Solid Sulphide, Assays Pending                

Hole RD 08 14:        31.39m (102.99 feet) of Near Solid Sulphide, Assays Pending

Hole RD 08 20:        48.39m (158.73 feet) of Near Solid Sulphide, Assays Pending

Vice-President of Exploration, Dr. George Gale states “We are very encouraged by the initial follow-up results to the discovery hole announced in October, 2007. We have intersected additional mineralization with similar lengths and values typical of those in operating mines in the area. We have intersections of Near Solid Sulphides at depths as shallow as 30m and as deep as 170m from surface. Preliminary Deep EM results also suggest that the deposit is open at depth. Drill results to date indicate a near vertical dip to the mineralization.”

 

 

Hole #

From

(m)

To

(m)

Int

(m)

Cu

%

Zn

%

Ag

g/tn

Au

g/tn

PULSE

EM

Off Hole

Conductor

RD07-07

123.43

150.10

26.27

1.00

4.48

12.34

0.81

 

 

  Inc

127.10

130.90

3.80

0.70

10.75

8.86

0.53

 

 

  Inc

134.76

136.24

1.48

3.84

1.88

43.92

1.86

 

 

  Inc

141.00

143.03

2.03

4.06

2.30

31.73

1.41

 

 

  Inc

143.03

149.54

6.51

0.35

4.38

4.37

0.37

 

 

RD07-08

 

 

NSI

 

 

 

 

Surveyed

YES

RD07-09

 

 

NSI

 

 

 

 

Surveyed

YES

RD07-10

98.28

141.36

43.08

0.72

4.27

9.39

0.62

 

 

  Inc

100.23

110.49

10.26

0.68

8.26

14.74

0.52

 

 

  Inc

124.05

129.75

5.70

0.27

4.26

3.61

0.07

 

 

RD07-11

 

 

NSI

 

 

 

 

 

 

RD07-12**

172.21

204.94

32.73

 

 

 

 

 

 

RD07-13

 

 

NSI

 

 

 

 

 

 

RD08-14**

70.79

102.18

31.39

 

 

 

 

 

 

RD08-15

 

 

NSI

 

 

 

 

 

 

RD08-16**

63.44

66.46

3.02

 

 

 

 

 

 

RD08-17

 

 

NSI

 

 

 

 

 

 

RD08-18

 

 

NSI

 

 

 

 

 

 

RD08-19

 

 

IP

 

 

 

 

 

 

RD08-20** 

41.61

90.00

48.39

 

 

 

 

 

 


 

  ** = Near Solid Sulphide intercept (assays pending)

  NSI = no significant interval; IP = in progress

 

 

The analysis of the Discovery Zone continues with the following activities, all designed to assist in defining the deposit as quickly and efficiently as possible:

 

 

UPCOMING DRILL TARGETS:

 

The two drills operating on the discovery zone will continue to test the mineralization on 25m spaced sections to confirm the strike, dip and extent of the body and to explore for additional sulphide lenses. In addition, A third drill has been mobilized onto the Tower Zone area, located approximately 1 km east of the discovery zone, where alteration and minor mineralization typical of VMS deposits were intersected in the summer program in holes RD 07 04, RD 07 05 and RD 07 06.

 

 

DOWN-HOLE PROBE/PULSE EM

 

Down-hole PULSE EM surveys of holes RD07-08 and RD07-09, (which did not intersect near solid sulphides) indicate the presence of strong off-hole conductors. Late time channel responses, indicative of good conductivity, show off-hole responses near the end of the boreholes. The geophysical responses of the borehole EM surveys are complex and show that extensive conductivity is located near the boreholes. The off-hole anomalies will be tested in this drill program. The Company has left the casing in each completed drill hole and plans to probe a number of these holes when the system returns to the property, anticipated for mid-February.   

 

 

DEEP EM SURVEY

 

In anticipation of drill testing deeper targets, the Company contracted to utilize a Deep EM ground survey which is capable of detecting more subtle and deeper targets than the VTEM airborne survey. Four lines of a planned twenty-two line ground DEEPEM survey have been completed. The survey is estimated to detect conductive bodies to a depth of at least 300m. The initial four lines of the DEEPEM survey, though only covering 300 meters of the earlier identified 800 meter long VTEM airborne anomaly, indicates a southerly plunging and strongly conductive body. Further drilling will be required to confirm this interpretation.  

 

 

HLEM SURVEY

 

Due to the fact that mineralization has been intersected within 30m of surface (hole RD 08 20), a Horizontal Loop EM survey is being sourced to accurately delineate the near surface portion of the deposit. These deposits often occur as multiple sheets, so the HLEM survey will help to identify the presence of additional mineralized lenses near the surface in the area surrounding the discovery.

 

 

VTEM SURVEY

 

Geotech is currently flying the southern portions of the Reed Property which were not surveyed in the spring 2007 program. As part of this survey, the area surrounding the discovery is being flown in a north-south orientation to provide greater definition to the original VTEM anomalies.

 

Location of holes drilled on the Reed Project Discovery Zone:

.

HOLE ID

NORTH

EAST

LENGTH

DIP

AZ

RO-07-01

6048741

393926

250.00

-50

325

RO-07-02

6048735

394004

300.00

-45

340

RO-07-03

6048922

393959

200.00

-70

160

RO-07-07

6048759

393998

200.00

-45

340

RD-07-08

6048748

394046

335.00

-45

340

RD-07-09

6048703

394014

329.00

-45

300

RD-07-10

6048784

394005

225.00

-45

340

RD-07-11

6048787

393946

277.00

-45

340

RD-07-12

6048752

393988