HOLES RD 08-25, RD 08-26 and RD 08-30 INTERSECT NEAR SOLID
SULPHIDES: ASSAYS NOW PENDING ON 7 HOLES
19 February, 2008
Vancouver, B.C., February 19,
2008. VMS Ventures Inc. (TSX.V: VMS) (the Company) is pleased to report an
update of its ongoing exploration program at the Reed Project Discovery Zone
near Snow Lake, Manitoba
Highlights:
Hole RD 08-25:
2.35m (7.70 ft) of Near Solid Sulphide, Assays Pending
Hole RD 08-26:
24.86m (81.56 ft) of Near Solid Sulphide, Assays Pending
Hole RD 08-30: 22.68m
(74.40 ft) of Near Solid Sulphide, Assays Pending
Drill hole RD08-26 intersected
4 different zones of NSS over a core length of approximately 70 m.
The repetition of NSS in drill
hole RD08-26 may be due to folding or faulting.
Drill holes RD08-24 and
RD08-28, like drill holes RD08-18 and RD08-19, appear to have been drilled over
the top of the sulphide body into the barren hanging wall rocks.
REED LAKE DRILL HOLE DETAILS
|
DRILL
HOLE |
FROM
(m) |
TO
(m) |
INT |
Cu
% |
Zn
% |
Au
g/t |
Ag
g/t |
DHP |
STATUS |
|
RD08-23 |
|
|
|
|
|
|
|
|
Drilling |
|
RD08-24 |
|
|
|
|
|
|
|
|
NSI |
|
RD08-25 |
|
|
|
|
|
|
|
|
Drilling |
|
RD08-26 |
62.65 |
64.05 |
1.40 |
|
|
|
|
|
NSS |
|
RD08-26
And |
66.28 |
69.84 |
2.56 |
|
|
|
|
|
NSS |
|
RD08-26
And |
73.40 |
82.85 |
9.45 |
|
|
|
|
|
NSS |
|
RD08-26
And |
122.45 |
133.90 |
11.45 |
|
|
|
|
|
NSS |
|
RD08-27 |
|
|
|
|
|
|
|
|
Not Drilled Yet |
|
RD08-28 |
|
|
|
|
|
|
|
|
Complete |
|
RD08-29 |
|
|
|
|
|
|
|
|
Not Drilled Yet |
|
RD08-30 |
136.70 |
159.38 |
22.68 |
|
|
|
|
|
NSS |
|
RD08-31 |
|
|
|
|
|
|
|
|
Not Drilled Yet |
|
RD08-32 |
124.85 |
|
|
|
|
|
|
|
NSS |
NSI = No Sulphide
NSS = Near Solid Sulphide The true thickness of the intervals is not
known
Drill Holes RD08-22 and RD08-26
have been logged, sampled sent for assay. Drill holes RD08-25 and RD08-30 are
being logged and drill hole RD08-32 is still being drilled.
Vice President of Exploration,
Dr. George Gale states: “Drilling continues to provide near solid sulphide
intervals (NSS) over substantial thicknesses in drill core. Local folding and
faulting are complex and consequently the deposit geometry is complex in this
area. For example, the presence of magnetite above NSS in several of the recent
holes, instead of below the sulphide as in the earlier holes, suggests that the
deposit is tightly folded in the area of drilling. The next few drill holes are
located to the southwest of recent drilling and are designed to intersect the
deposit at depths of 100 to 150m.”
DRILL HOLE COORDINATES AND
DATA
|
DRILL
HOLE |
Northing |
Easting
|
EOH
(m) |
DIP |
AZIMUTH |
STATUS |
|
RD08-23 |
6048775 |
393978 |
|
-45o |
045 |
In progress |
|
RD08-24 |
6048838 |
393916 |
209.39 |
-45o |
045 |
045 |
|
RD08-25 |
6048765 |
393914 |
|
-45o |
045 |
In progress |
|
RD08-26 |
6048838 |
393916 |
145.39 |
-60o |
045 |
Assays Pending |
|
RD08-27 |
|
|
|
|
|
Not drilled yet |
|
RD08-28 |
6048845 |
393875 |
124.05 |
-45o |
045 |
045 |
|
RD08-29 |
|
|
|
|
|
Not drilled yet |
|
RD08-30 |
6048845 |
393875 |
273.41 |
-60o |
045 |
045 |
|
RD08-31 |
|
|
|
|
|
Not drilled yet |
|
RD08-32 |
6048819 |
393835 |
|
-45o |
045 |
In progress |
Geophysical crews are back onto
the property to complete the DEEP EM survey over the newly cut geophysical grid
and have now completed about one-third of the grid at this time. Down hole
geophysical surveys will be begin when this surface work is complete.
Geotech has now completed
flying the 2008 VTEM survey over the Discovery Zone in a north-south direction
to provide better definition of the geophysical anomalies identified during the
initial survey in March, 2007. The Company’s geophysical consultant is currently
evaluating the data
One of the three drills
currently on the Discovery Zone is scheduled to begin testing other anomalies
north of the discovery on the Reed Project as soon as its current hole is
completed. Due to the recent intensely cold weather, new roads to these new
drill sites have been packed and are ready for immediate use
All technical information in
this release has been reviewed by the Qualified Person, Dr. George Gale, P.Eng.
All samples have been prepared and analyzed at TSL Laboratories in Saskatoon,
Saskatchewan using ICP-MS and Fire Assay analytical methods.
VMS Ventures
Inc. is focused primarily on acquiring, exploring and developing copper-zinc
properties in the Flin Flon-Snow Lake VMS Belt. The Company also holds the
largest land package considered prospective for nickel-copper mineralization at
Lynn Lake, which is to date Canada’s third largest nickel producing camp. The
Company’s project portfolio consists of the Snow Lake VMS project, the Lynn Lake
Gabbros nickel-copper project, the Nickel Belt project, the South Bay
nickel-copper-cobalt PGE property, and the Eden Lake Carbonatite Complex,
Specialty Metals property. All VMS Ventures Inc. properties are located in the
mining friendly province of Manitoba, Canada.
ON BEHALF
OF THE BOARD OF DIRECTORS
John
Roozendaal B.Sc.
President &
Director
For further information contact:
|
Keith Patey,
Director of Communications
Telephone: (604) 986-2020
Toll Free: 1-866-816-0118 |
Dale Paruk
Coal Harbor Communications
Telephone: (604) 662-4505
Toll Free: 1-877-345-3399 |
The TSX Venture exchange does not accept responsibility for the
adequacy or
accuracy of this release.
|