
The Ruttan South Project occurs 23 km southeast of the Town of Leaf Rapids where, until recently, active mining and milling of base and precious metals at the 70 million ton Ruttan zinc-copper deposit had been ongoing. The property is 12 km south of the Ruttan deposit and consists of 15 claims with a total area of 3,637 hectares. The property is 100% owned by VMS Ventures. The proximity to the Ruttan Zn-Cu-Pb deposit and similar stratigraphic settings between the 70 million ton Ruttan deposit (2.86% Zn and 0.76% Cu) and that in the project area make this a compelling exploration target.